*Dated: *********EXTENTION OF DATE OF LAST PAYMENT OF KWSB BILLS*************Managing Director /CEO, KWSB has extended the last date of payment of KWSB Bills from 23-03-2023 to 30-03-2023*******27-02-2023**On the instructions of CEO KW&SB Engineer Syed Salahuddin Ahmed, arrangements made for the improvement of water supply and drainage in the National Stadium during the PSL. *****27-02-2023**-٭٭٭Detailed visit of CEO Water Board Engineer Syed Salahuddin Ahmed to Lyari Townن٭٭٭٭During the visit, various UCs ​​including all pumping stations of water supply and drainage were also inspected******Chief Engineer Sewerage Aftab Alam Chandio and other senior officials of the Water Board accompanied him**** *****The newly elected UCS Chairman of Lyari along with the leaders of PP Lyari briefed the CEO Water Board about the problems faced by them.*****CEO Water Board assured leaders and citizens to resolve all issues on priority basis*******All complaints of water supply and drainage across the city, including Lyari, should be eliminated on an emergency basis. CEO Water Board Engineer Syed Salahuddin Ahmed*** ********CEO KW&SB Engineer Syed Salahuddin Ahmed visiting Sewage Treatment Plant.***CEO KW&SB Engineer Syed Salahuddin Ahmed giving instructions to the officials on the occasion of the visit to the sewage treatment plant. ***08-02-2023* ***CEO Water Board Engineer Syed Salahuddin Ahmed took notice of theft incidents at Pak Colony Haroonabad Sewage Treatment Plant.****On the orders of the CEO Water Board, the security department of the Water Board conducted an operation at the treatment plant*****The operation was headed by Chief Security Officer Water Board Nisar Ahmed Magsi and Major Abdul Majeed Awan (R).*****During the operation, 12 accused have been detained on the spot. Chief Security Officer Water Board ****No one will be allowed to steal or encroach on all installations and land of the Water Board. CEO Water Board Engineer Syed Salahuddin Ahmed*****The operation was headed by Chief Security Officer Water Board Nisar Ahmed Magsi and Major Abdul Majeed Awan (R).******No one will be allowed to steal or encroach on all installations and land of the Water Board. CEO Water Board Engineer Syed Salahuddin Ahmed Accused involved in theft do not deserve any discount. CEO Water Board*** ***Strict legal action will be taken against all the accused involved in the theft to bring them to justice. CEO Water Board********* *******The Water Board is working well under the supervision of CEO/MD Water Board Engineer Syed Salahuddin Ahmed and COO Water Board Engineer Asadullah Khan. Sindh Local Government Minister ******Constomer Services Center Lower Block A Ninth Mile Karsaz Shahrah Faisal Lal Qila Restaurant Karachi Phone:-021-99245138-43 Fax 021-99245190 Whatup:0319-2046357 *************** Issued by Public Relations Officer**

Water Management

Karachi water & sewerage board is one of the biggest water & waste water utility in this region.

Water is being supplied to Karachi from a considerably distant located water source through bulk conveyance system comprising of a complex network of canals, conduits, siphons, multi-stage pumping and filtration.

WATER MANAGEMENT:

Water is being supplied to Karachi from c considerably distant locate water source through bulk conveyance system comprising of a complex network of canals, conduits, siphons, multi-stage pumping and filtration.

KARACHI WATER SUPPLY HISTORIC FACTS:

  • The quota of 450 cusecs (242 MGD 1089ml/day for Ruby season) and 520 cusecs (280 MDG 1260ml/day for Kharif season) form Indus reiver was sanctioned on May 11, 1957.
  • In 1988, the same quota was increased to 1200 cusecs (2880 ml/day) by Presidentail decree, which has been exhausted in 2006 with implementation of K-III Project.

WATER SUPPLY SCENARIO:

  • The present supply to Karachi from Indus and Hub source is approx 650MGD (2925 ml/day).
  • The per capita water demand @ 54 GPCD for population 20 Million is estimated as 1080 MDG.
  • The current short fall is anticipated as 430 MGD.
  • First Phase of K-IV Project may take up to 5 years to complete i.e. by the year 2015.
  • By the year 2015, projected population of Karachi will be 23 Million and @ 54 gallons per capita per day, the demand of water shall be 1242 MGD.
  • By the year 2015 there will be a short fall of 600 MGD (2700 ml/day) water.
  • 100 MGD (450 ml/day) additional water is required after every 5 years to bridge the gap of demand and supply.