Customer Service Centre: 9924513899245140

*Dated: *********EXTENTION OF DATE OF LAST PAYMENT OF KWSB BILLS*************Managing Director /CEO, KWSB has extended the last date of payment of KWSB Bills from 23-03-2023 to 30-03-2023*******27-02-2023**On the instructions of CEO KW&SB Engineer Syed Salahuddin Ahmed, arrangements made for the improvement of water supply and drainage in the National Stadium during the PSL. *****27-02-2023**-٭٭٭Detailed visit of CEO Water Board Engineer Syed Salahuddin Ahmed to Lyari Townن٭٭٭٭During the visit, various UCs ​​including all pumping stations of water supply and drainage were also inspected******Chief Engineer Sewerage Aftab Alam Chandio and other senior officials of the Water Board accompanied him**** *****The newly elected UCS Chairman of Lyari along with the leaders of PP Lyari briefed the CEO Water Board about the problems faced by them.*****CEO Water Board assured leaders and citizens to resolve all issues on priority basis*******All complaints of water supply and drainage across the city, including Lyari, should be eliminated on an emergency basis. CEO Water Board Engineer Syed Salahuddin Ahmed*** ********CEO KW&SB Engineer Syed Salahuddin Ahmed visiting Sewage Treatment Plant.***CEO KW&SB Engineer Syed Salahuddin Ahmed giving instructions to the officials on the occasion of the visit to the sewage treatment plant. ***08-02-2023* ***CEO Water Board Engineer Syed Salahuddin Ahmed took notice of theft incidents at Pak Colony Haroonabad Sewage Treatment Plant.****On the orders of the CEO Water Board, the security department of the Water Board conducted an operation at the treatment plant*****The operation was headed by Chief Security Officer Water Board Nisar Ahmed Magsi and Major Abdul Majeed Awan (R).*****During the operation, 12 accused have been detained on the spot. Chief Security Officer Water Board ****No one will be allowed to steal or encroach on all installations and land of the Water Board. CEO Water Board Engineer Syed Salahuddin Ahmed*****The operation was headed by Chief Security Officer Water Board Nisar Ahmed Magsi and Major Abdul Majeed Awan (R).******No one will be allowed to steal or encroach on all installations and land of the Water Board. CEO Water Board Engineer Syed Salahuddin Ahmed Accused involved in theft do not deserve any discount. CEO Water Board*** ***Strict legal action will be taken against all the accused involved in the theft to bring them to justice. CEO Water Board********* *******The Water Board is working well under the supervision of CEO/MD Water Board Engineer Syed Salahuddin Ahmed and COO Water Board Engineer Asadullah Khan. Sindh Local Government Minister ******Constomer Services Center Lower Block A Ninth Mile Karsaz Shahrah Faisal Lal Qila Restaurant Karachi Phone:-021-99245138-43 Fax 021-99245190 Whatup:0319-2046357 *************** Issued by Public Relations Officer**

KWSSIP

ENVIRONMENTAL MANAGEMENT FARAMEWORK

Pdf format

EXECUITIVE SUMMARY KWSSIP SMF IN URDU TRANSLATED

Pdf format

EXECUITIVE SUMMARY KWSSIP SMF IN URDU TRANSLATED

Pdf format

SERVICES IMPROVEMENT PROJECT SOCIAL MANAGEMENT FRAMEWORK

Pdf format

Karachi Water & Sewerage Services Improvement Project (Project Implementation Unit)

Pdf format

Karachi Water & Sewerage Services Improvement Project (Project Implementation Unit)

Pdf format

TORs Communicatin Specialist

Pdf format

TORs Environmental Specialist

Pdf format

TORs Financial Specialist

Pdf format

TORs Social Development Specialist WB Approved

Pdf format

TORs Procurement and Contract Management Specialist

Pdf format

Updated:- 03-01-2020

OUTLINE OF TORS & INSTRUCTIONS TO CONSULTING FIRMS

Pdf format

Updated:- 27-01-2020

Karachi Water & Sewerage Services Improvement Project (KWSSIP) Karachi Water & Sewerage Board “Procurement of 14 Pairs of Sewage Suction Trucks & Mobile Jetting Trucks including Fast Moving Spare Parts and Maintenance

Pdf format

KARACHI WATER & SEWERAGE SERVICES IMPROVEMENT PROJECT (KWSSIP) CORRIGENDUM Dated:-06-03-2020

Pdf format

PROCUREMENT OF 14 PAIRS OF SEWAGE SUCTION TRUCKS AND MOBILE JETTING TRUCKS INCLUDING FAST MOVING SPARE PARTS AND MAINTENANCE Dated:-18-03-2020

Pdf format

KARACHI WATER & SEWERAGE SERVICES IMPROVEMENT PROJECT (KWSSIP) CORRIGENDUM 25-03-2020

Pdf format

KARACHI WATER & SEWERAGE SERVICES IMPROVEMENT PROJECT (KWSSIP) CORRIGENDUM Reference to the Request for Bids (RFB) published Vide No. KWSB/DPR/16/2020 in the leading Newspapers, dated January 28/29,2020, UPDATED 21-04-2020;

Pdf format

KARACHI WATER & SEWERAGE SERVICES IMPROVEMENT PROJECT (KWSSIP) CORRIGENDUM Dated:-13-05-2020

Pdf format

REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES –FIRMS SELECTION Islamic Republic of Pakistan Karachi Water & Sewerage Services Improvement Project [KWSSIP] Loan No./Credit No./Grant No.: P164704; Loan IBRD 8994 – PK

Pdf format

OUTLINE OF TORS & INSTRUCTIONS TO CONSULTING FIRMS for Submission of Expression of Interest Consultancy Services For Design, Tender Documents and Supervision for Sub-Projects of SOP-I Karachi Water and Sewerage Services Improvement Project (KWSSIP)

Pdf format

KARACHI WATER & SEWERAGE SERVICES IMPROVEMENT PROJECT (KWSSIP) CORRIGENDUM

Reference to the Request for Expressions of Interest (EOI)published Vide No. KWSB/DPR/87/2020 in the leading Newspapers, dated August 11/12,2020, inviting EOI’s from the eligible Consulting Firms for the following Consultancy Assignmentunder Karachi Water & Sewerage Services Improvement Project (KWSSIP) 31-08-2020.

Pdf format

Consultancy Services for Design of a HR Plan & Trainings to KW&SB Staff– Software& Hardware of HR System(Dated-10-11-2020) .

Pdf format

Request for Bids for Procurement of Equipment, Furniture and Fixtures for PIU Office of Karachi Water & Sewerage Services Improvement Project [KWSSIP](Dated-13-11-2020) .

Pdf format

Gender Specialist TOR FOR STEP(Dated-16-11-2020) .

Pdf format

GIS SPECIALIST TOR’S FOR STEP(Dated-16-11-2020) .

Pdf format

TORs ENVIRONMENTAL SPECIALIST(Dated-16-11-2020) .

Pdf format

TORs procurement and contract management specialist KWSSIP(Dated-16-11-2020) .

Pdf format

Request for Expression of Interest Consultancy Firm for Customer Survey & Identification (Bulk & Retail) Improved Revised Billing & Collection System, Tariff Review ( Dated-18-11-2020) .

Pdf format

ENVIRONMENTAL MANAGEMENT FRAMEWORK Karachi Water Supply and Sewerage Improvement Project (KWSSIP)( Dated-25-11-2020) .

Pdf format

KARACHI WATER AND SEWERAGE SERVICES IMPROVEMENT PROJECT SOCIAL MANAGEMENT FRAMEWORK (KWSSIP)( Dated-25-11-2020) .

Pdf format

EXPRESSION OF INTEREST (Re-invited) Assessment of Energy Efficiency, Load Management & Renewable Energy Options for KW&SB’s Water & Wastewater Installations (KWSSIP)( Dated-09-12-2020) .

Pdf format

REQUEST FOR EXPRESSION OF INTEREST CONSULTING SERVICES – SHORTLISTING OF FIRMS Assignment Title: Study on Financial Management Best Practices (KWSSIP)( Dated-11-12-2020) .

Pdf format

Request for Expression of Interest Consultancy Services for Study on Financial Management Best Practic (KWSSIP)( Dated-12-12-2020) .

Pdf format

Request for Expression of Interest For Environment & Social Assessment Studies of Group – 2 for SOP 2 of KWSSIP( Dated-14-12-2020) .

Pdf format

Request for Expression of Interest For Feasibility Studies, Design Review & Detailed Engineering Design of Group 03 Sub-Projects for SOP 2 of KWSSIP [TORs, Instructions and Shortlisting Criteria for EOI]( Dated-14-12-2020) .

Pdf format

Request for Expression of Interest For Environment & Social Assessment Studies of Group – 1 for SOP 2 of KWSSIP ( Dated-21-12-2020) .

Pdf format

REQUEST FOR EXPRESSION OF INTEREST For FEASIBILITY STUDY, DESIGN REVIEW & DETAILED ENGINEERING DESIGN OF PREPARATORY WORKS OF GROUP 04 OF SOP – 2 OF KWSSIP(Dated:-21-12-2020)

Pdf format

REQUEST FOR EXPRESSION OF INTEREST For INDIVIDUAL PROJECT MANAGEMENT CONSULTANTS PREPARATORY STUDIES FOR SOP – 2 OF KWSSIP (Dated:-21-12-2020)

Pdf format

Request for Expression of Interest for Consultancy Services Project Management Consultant for PIU KWSSIP (Dated:-30-12-2020)

Pdf format

REQUEST FOR EXPRESSIN OF INTEREST FOR FEASIBILITY STUDY& DETAIL DESIGN OF PREPARATORY WORKS OF GROUP 05OF SOP – 2 OF KWSSIP (Dated:-12-02-2020)

Pdf format

TERMS OF REFERENCE CONSULTANCY SERVICES FOR THE FORMULATION OF KARACHI WATER SUPPLY AND SEWERAGE MASTER PLAN 2047

Pdf format

Terms of Reference (TORs) Institutional Reform Studies of KW&SB

Pdf format

TERMS OF REFERENCES (ToRs) ENGAGEMENT OF CONSULTANCY OF FIRM / HEAD HUNTING FIRM FOR RECRUITMENT OF PROFESSIONALS

Pdf format

Head office behind civic center old KBCA Building , Gulshan Iqbal
Opening Hours:

Mon – Fri: 9:00 am – 5:00 pm

© 2021. All Rights Reserved By KWSB