Customer Service Centre: 9924513899245140

*Dated: **14-09-2023*******Sodium hypochlorite is being added to the water under the direction of the Pakistan Council of Research in Water Resources and with the support of UNICEF to prevent drinking water-borne diseases in the city. Interpreter****The purpose of adding sodium hypochlorite is to protect citizens from cholera and other diseases. Spokesman Water Corporation****Water Corporation adds the required amount of chlorine to the water as per the standard and quantity prescribed by the World Health Organization*****The purpose of adding sodium hypochlorite is to protect citizens from cholera and other diseases. Spokesman Water Corporation****Sodium hypochlorite is being provided by the leading company of Pakistan. ****Water Corporation adds the required amount of chlorine to the water as per the standard and quantity prescribed by the World Health Organization. ***The process of adding chlorine to the water supplied from all government hydrants of the Water Corporation has also been ensured. ****All project costs are being borne by UNICEF. Spokesman Water Corporation ********The restoration of the affected line should be completed on an emergency basis. Directed by CEO Water Corporation Engineer Syed Salahuddin Ahmed*** ******Constomer Services Center Lower Block A Ninth Mile Karsaz Shahrah Faisal Lal Qila Restaurant Karachi Phone:-021-99245138-43 Fax 021-99245190 Whatup:0319-2046357 *************** r**

Sewerage Tariff

S.#

 HISTORY OF CONSERVANCY / SEWERAGE TARIFF REVISION

.

Residential

 

w.e.f

1st July 1990

 

w.e.f

4th Aug’1992

w.e.f

1st Nov’ 1994

w.e.f

1st Jul’1995

w.e.f Nov’1996

w.e.f April’1998

w.e.f July’2001

w.e.f July’2008w.e.f July’2009w.e.f July’2010

w.e.f Sep’2011

01.DOMESTIC   UN METERED (SQ.YD) UPTO 604.506.7510.0013.0013.0017.008.509.00
 

UPTO-

61–>120

6.009.0015.0020.0020.0026.0013.0014.00
 

UPTO 

121–>200

13.5020.2525.0033.0033.0043.0021.5023.00
 

UPTO       

201–>300

20.2530.3835.5046.0046.0060.0030.0033.00
 

UPTO       

301–> 400

27.7541.6345.0059.0059.0077.0038.5042.00
 UPTO         401–> 60039.7559.6370.0091.0091.00118.0059.0064.00
  UPTO        601–>100056.2584.38105.00137.00137.00178.0089.0097.00
 UPTO         1001–>1500112.50168.75210.00273.00273.00355.00177.50193.00
 UPTO         1501–>2000140.25210.38275.00385.00385.00465.00232.50253.00
 UPTO         2001–> 2500172.50258.75350.00455.00455.00592.00296.00323.00
 UPTO         2501–> 3000210.00315.00445.00579.00579.00753.00376.50410.00
 UPTO         3001 –>3500247.00371.25540.00702.00702.00913.00456.50498.00
 UPTO         3501 –>4000285.00427.50645.00839.00839.001,091.00545.50595.00
 

UPTO         4001 –>4500

322.50483.75750.00975.00975.001,268.00634.00691.00
 

UPTO         4501–> 5000

 367.50551.25885.001,151.001,151.001,496.00748.00815.00
 ABOVE- 5000412.50618.751020.001,326.001,326.001,724.00862.00940.00
02.ADDITIONAL STORIES(75%OF G.F)(75% OF G.F)(75% OF G.F)(75% OF G.F)(75% OF G.F)(75% OF G.F)(50% OF G.F)(50% OF GRD. FLR)(50% OF G.F)(50% OF G.F)(50% OF G.F)

FLATS RATES IS CALCULATED UPON SQUARE FEET

 FLATS UPTO 5006.009.0010.0013.0013.0017.008.508.50
 

 UPTO- 

501–>-800

9.0013.0015.0020.0020.0026.0013.0013.00
 

 UPTO-

801–>-1000

11.5017.2520.0026.0026.0034.0017.0017.00
  UPTO        1001–>1200 22.0033.0035.0046.0046.0060.0030.0030.00
  UPTO        1201–>1500 33.7550.6355.0072.0072.0094.0047.0047.00
  UPTO        1501–>1800 56.2584.38100.00130.00130.00169.0084.5084.50
  UPTO        1801–>2000 67.50101.25125.00163.00163.00212.00106.00106.00
  UPTO        2001–>2500 82.50123.75155.00202.00202.00263.00131.50131.50
  UPTO        2501–>3000 97.50146.25190.00247.00247.00321.00160.50160.50
  UPTO        3001–>3500 112.50168.75230.00299.00299.00389.00194.50194.50
  UPTO        3501–>4000 127.50191.25270.00351.00315.00456.00228.00228.00
  UPTO        4001–>5000  180.00270.00395.00514.00514.00668.00334.00334.00
  ABOVE     5000        225.00337.50510.00663.00663.00862.00431.00431.00
             
 COMMERCIAL  /INDUSTRIAL  COMMERCIALCOMMERCIALCOMMERCIALCOMMERCIALCOMMERCIALCOMMERCIALCOMMERCIAL 
 Not Connected with Water line 50%(WATER)50%(WATER)50%(WATER)50%(WATER)50%(WATER)50%(WATER)50%(WATER) 
  IndustrialIndustrialIndustrialIndustrialIndustrialIndustrialIndustrial 
 Connected with Water Line un Metered50%(WATER)50%(WATER)50%(WATER)50%(WATER)50%(WATER)50%(WATER)50%(WATER) 

03

BULK SUPPLY

i) Metered Domestic (Per 1000 Gallons)

ii) Industrial / Commercial (Per 1000 Gallons)

Connected with Sewerage line with KMC Limits 50% of WaterConnected with Sewerage line with KMC Limits 50% of WaterConnected with Sewerage line with KMC Limits 50% of WaterConnected with Sewerage line with KMC Limits 50% of WaterConnected with Sewerage line with KMC Limits 50% of WaterConnected with Sewerage line with KMC Limits 50% of WaterConnected with Sewerage line with KMC Limits 50% of Water 

04

Offices—-—-—-—-—-—-

25% of Water Charges

 

25% of Water Charges

 

05Shops—-—-—-—-—-—-25% of Water Charges25% of Water Charges
06

Dhobi-Ghat ,Restaurants, Agricultural, Nurseries , Marriage hall, clubs,  block thallas, cattle ponds, Hammam

—-—-—-—-—-—- 

25% of Water Charges

 

25% of Water Charges

06Commercial high rises & Hotel Single unit—-—-—-—-—-—-25% of Water Charges25% of Water Charges
 College , School, Clinics, Hospitals—-—-—-—-—-—-25% of Water Charges25% of Water Charges
 BULK SUPPLY 
a

Metered domestic (Per 1000 gallons)

—-—-—-—-—-—-25% of Water Charges25% of Water Charges—-—-—-
b

Industrial (Per 1000 gallons)

—-—-—-—-—-—-

25% of Water Charges

25% of Water Charges

—-—-—-
c

Commercial (Per 1000 gallons)

—-—-—-—-—-—-25% of Water Charges25% of Water Charges—-—-—-