Wednesday, November 22, 2017
| 3:53:39 PM

***   The following measures may reduce your risk of naegleria infection: ******Don't swim in or jump into warm freshwater lakes and rivers.******Hold your nose shut or use nose clips when jumping or diving into warm bodies of fresh water.******Avoid disturbing the sediment while swimming in shallow, warm fresh waters..***** Don’t let water waste away, so we can have it another day** *Big and small, saving water, helps us all**

  • Complain
    Complain
  • MD
    MD
  • KWSB TECHNICAL SITE
    PUMPING STATIONS KWSB
  • MD
    MD
  • MD KWSB HRZ
    COD FILTER PLANT
  • Complain
    Complain
  • DISTRIBUTION OF APPOINTMENT LETTER
    DISTRIBUTION OF APPOINTMENT LETTER
  • MD KWSB HRZ
    MD KWSB VISIT FILTER PLANT
  • MD KWSB HRZ
    MD KWSB VISIT ENGINEERING SITE
  • MD KWSB HRZ
    MD KWSB VISIT FILTER PLANT
  • MD KWSB HRZ
    MD KWSB HRZ
  • MD KWSB HRZ
    BALLOTING FOR HAJJ
  • DISTRIBUTION OF APPOINTMENT LETTER
    DISTRIBUTION OF APPOINTMENT LETTER
  • Complain
    Complain
  • DISTRIBUTION OF APPOINTMENT LETTER
    DISTRIBUTION OF APPOINTMENT LETTER
  • MD KWSB HRZ
    ANNOUNCEMENT FOR HAJJ BALLOTING
  • MD KWSB HRZ
    MD KWSB HRZ
  • KWSB EVENT
    BULK WATER SUPPLY SCHEME K-IV
  • Complain
    Complain
  • MD KWSB HRZ
    MD KWSB VISIT CANAL
  • MD KWSB HRZ
    MD KWSB HRZ
  • Complain
    Complain
  • KWSBPIC
    MESSAGE FROM MD KWSB
  • KWSBPIC
    KWSBPIC
  • KWSBPIC
    KWSBPIC
  • Save Water
    save water save life
  • Water Supply
    Water Supply scheme for different islands of Karachi
  • Galte Valve
    Gate Valve installation at Baldia Town
  • Gujjo
    GUJJO HEADWORK
  • Complain
    Complain
Information Desk

For emergency problems regarding your home or street sewerage complaints
please contact:
MD Camp Office
99244595 - 99244596
Customer Service Centre Karsaz 
99245138 - 99245140
Head Office Complaint Centre 
99230317

Customer Care Centre

Water Tariff
Sewerage Tariff
Post an Online Complaint
Online New Connection Form

Quantum of Services

TOTAL QUANTUM OF SERVICES TO MANAGE AND LOOK AFTER.

  • OVER 150 PUMPING STATIONS
  • 25 BULK RESERVOIRS ON INSTALLATIONS
  • OVER 10,000 KM OF PIPE LINES
  • OVER 900 MILLION GALLONS OF FLUID
  • BILLING AND RECOVERY OF 1.4 MILLION ESTABLISHMENT / CONSUMERS
  • OVER 400,000 VALVES
  • OVER 250,000 MANHOLES
  • OVER 3,600 SQ. KMS OF AREA & 18 MILLION KARACHI

    WATER SUPPLY
  • POPULATION           18 MILLION
  • MAXIMUM DEMAND  (@ 30 - 54 gped)          972 MGD
  • MINIMUM DEMAND   (@ 30-  54 gped)          720 MGD
  • AVAILABLE SUPPLY                                                          
  • INDUS SOURCE   :--------
  • Greater Karachi   280 mgd
  • Gharo                028 mgd
  • K-II                   100 mgd
  • Additional           040 mgd                 
  • K-III                  100 mgd               
  • Steel Mill            022 mgd
  • PQA                   008 mgd
  • HUB DAM            090 mgd
  • DUMLOTEE WELLS 002 mgd
  • TOTAL:-              670 mgd    
  • Water Lose Reducation 35%         (-)  234.50 MGD                             

            Available Water Supply                     435.50 MGD

 

   WATER LOSSES (35%) Net Supply (after accounting for Leakage / Pilferage / Non revenue water (NRW)  435  MGD

   At Present a total 640 Approx MGD of water is being supplied to the city of Karachi (except Steet Mills & PQA) out of which 440 MGD is being filtered at:-
 

  • COD Filter Plants ( 70 + 45)          115MGD
  • Pipri (New) Filter Plant                 050MGD
  • Pipri (Old) Filter Plant (25 +25)      050MGD
  • NEK (old) Filter Plant                   025MGD
  • NEK (New) Filter Plant                 100MGD
  • Hub Filter Plant                          080MGD
  • Gharo Filter Plants (10 + 10)         020MGD
  • TOTAL==================>   440MGD

GAP OF 212 MGD IN WATER SUPPLY AND FILTRATION CAPACITY
 

Sewage Generation & Treatment

  • Bulk Water Generation                                      670 mgd
  • Sewage generated (at 60% of 670 mgd )             402 mgd
 Description TP-1 TP-II TP-III TOTAL
Treatment Capacity 51 mgd 46 mgd 54 mgd 151 mgd
Present Treatment 25 mgd 30 mgd 35 mgd 90  mgd
Deficiency in Optimal Capacity 26 mgd 16 mgd 19 mgd 61  mgd
Shortfall in Treatment Capacity 402-151=251 mgd